Land to the East of, Dutch Road, Mark, Highbridge, Somerset, TA9 Data via plota.co.uk

33/25/00033 - Overhead Electric Line Permitted Development

Proposal

Notification under the Overhead Lines (Exemption) (England and Wales) Regulations 2009 for the refurbishment of the pole mounted transformer on pole no. 21GGB7, including the replacement of 1No. existing 50kVa transformer with 1No. 100kVa transformer, replacement of 1No. 10.5m medium pole and 1No. 10m medium pole with 1No. 10.5m stout pole and 1No. 10m Stout poles. The works will be accessed via a field gate located next to Elm Tree Cottage, Dutch Road, Highbridge, TA9 4QR (Grid Ref: ,147954) with all works being carried out after April 2026. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Dec 2025
Decision
Target date was 3 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 324.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 986 m away: Hinkley Point C Connection
The site is about 986 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 891 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Overhead Electric Line
Received
9 Dec 2025
Validated
9 Dec 2025
Parish
Mark

Decision outlook

Day 324, past the statutory target. 87% of other in Sedgemoor are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 14 Oct 2026.

Day 324268 days past the 56-day target
69%decided within 8 weeks
95%approved
2,189decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Sedgemoor to go on. Sedgemoor decision record →

Consultation & key dates

Consultation
13 Mar 2026