Unsworth Cricket And Tennis Club Ltd, Pole Lane, Bury, BL9 8QL Data via plota.co.uk

73641 - Condition Discharge Approved

Proposal

Application for the Discharge of the Condition 3 (detailed finish) to 73059 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Consultation
21 Sept 2026
✓
Approved
2 Oct 2026

Approved on 2 Oct 2026 · Delegated · Last checked 17 Oct 2026

Site constraints 7

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Article 4 direction
Bury borough HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 45 m away: M60/M62/M66 Simister Island
The site is 45 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Air quality management area 28 m away: Bury AQMA.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area517 m² (5,565 sq ft)
Energy ratingB (asset rating 44)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in October 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bury
Application type
Condition Discharge
Postcode
BL9 8QL
Received
15 Sept 2026
Validated
15 Sept 2026
Case officer
Show
Target decision
10 Nov 2026
Decision
Approve
Decision date
2 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
AshtonHale

Public comments

No public comments yet.

Last counted 17 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15226481
Planning Portal ref
PP-15226481
Consultation
21 Sept 2026
Comments by
12 Oct 2026
Statutory expiry
10 Nov 2026
Env. assessment
No
Bury
Planning Authority Score
7.5/10
Good
#41 of 296 councils
Relevant to this application:
Householder decisions

Bury is faster than most councils at deciding householder applications, ranking #61 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bury decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #191 of 296
94%
Householder approved
Above avg (90%) #99 of 296
76%
Decided in 8 weeks
Above avg (63%) #61 of 296
32%
Extended time limit
Below avg (41%) #64 of 296
59%
Minor dwellings approved
61 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
79%
Change of use approved
63 decided
757
Total decisions
109 refused in the year to March 2026