26/0489 - Householder Planning Application Awaiting Delegated Issue

Proposal

Alterations and extensions to dwelling comprising: 1) demolition of existing single storey rear extension and conservatory; 2) raising of ridge height; 3) erection of two storey rear extension; and 4) alterations to windows and doors on all elevations including removal of ground floor bay window and formation of canopy to front and insertion of new first floor windows on east and west facing side elevations of dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Aug 2026
✓
Validated
25 Aug 2026
Decision
Target date was 20 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 64.

The consultation period closed on 1 Oct 2026.

Site constraints 6

Green belt: Blackpool
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project about 129 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 129 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 36 m away: Marton Moss; Inside the Blackpool built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £285,000 in May 2026. Detached house, freehold.

19 May 2026£285,000
7 May 2019£275,000
30 March 1998£85,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Fylde - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fylde
Application type
Householder Planning Application
Postcode
FY4 5EA
Received
14 Aug 2026
Validated
25 Aug 2026
Ward
Kilnhouse New
Parish
St Anne's on the Sea
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
WBD Architectural Consultants Ltd

Decision outlook

Day 64, past the statutory target. 85% of demolitions in Fylde are decided within thirteen weeks, which runs to 24 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 648 days past the 56-day target
59%decided within 8 weeks
95%approved
40decided in the last year

Plota live figures for demolitions decided by Fylde in the last twelve months, from validation. Fylde decision record →

Consultation & key dates

Consultation
1 Sept 2026
Comments by
1 Oct 2026
Site or press notice
10 Sept 2026
Fylde
Planning Authority Score
5.3/10
Average
#130 of 296 councils
Relevant to this application:
Householder decisions

Fylde ranks #184 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Fylde decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #11 of 296
98%
Householder approved
Above avg (90%) #17 of 296
60%
Decided in 8 weeks
Below avg (63%) #184 of 296
49%
Extended time limit
Above avg (41%) #220 of 296
79%
Minor dwellings approved
43 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
100%
Change of use approved
28 decided
422
Total decisions
16 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.