Land Off Stallingborough Road, Keelby, Grimsby, DN41 8DH Data via plota.co.uk

WL/2025/00667 - Full Planning Application - Major Approved at committee

Approved at planning committee on 19 August 2026. The council has not issued its decision notice yet.

Proposal

Planning application for construction of solar farm and battery energy storage system, comprising ground mounted solar photovoltaic panels, battery containers, transformers, high voltage electrical substation and ancillary infrastructure including underground cabling, fencing, CCTV, internal access tracks, water storage tanks and an attenuation pond together with landscape enhancements, woodland and a permissive footpath for a temporary period of 40 years (cross boundary application with North East Lincolnshire Council) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2025
✓
Validated
1 Jul 2025
✓
Committee
19 Aug 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 484.

The consultation period closed on 14 Aug 2025.

Planning committee

Decided by West Lindsey Planning Committee on 19 Aug 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised approval because renewable energy benefits outweighed identified impacts, subject to conditions and a monitoring obligation.
  • The committee voted to grant permission with ecological, archaeological, landscaping, decommissioning and panel-management conditions.
Read how the committee decided The proposal, site and history, officers’ assessment, objections, speakers, committee debate, conditions and decision.

Source: Plota analysis of West Lindsey's committee minutes of 19 Aug 2026.

Site constraints 3

Radon-affected area
National infrastructure project: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, the site is inside its boundary); Viking CCS Pipeline (decided, 330 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary); Grimsby to Walpole (at pre-application, 1379 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon-affected areaCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 15 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application - Major
Postcode
DN41 8DH
Received
29 May 2025
Validated
1 Jul 2025
Ward
CAISTOR AND YARBOROUGH
Parish
Keelby CP
Case officer
Show
Target decision
30 Sept 2025
Decision level
Planning Committee
Applicant
Show

Decision outlook

Day 484, past the statutory target. 63% of full applications in West Lindsey are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Oct 2026.

Day 484428 days past the 56-day target
37%decided within 8 weeks
88%approved
12%go to committee

Plota live figures for full applications decided by West Lindsey in the last twelve months, from validation. West Lindsey decision record →

Public comments

9comments received

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP/2025/00600
Consultation
2 Jul 2025
Comments by
14 Aug 2025
Committee
19 Aug 2026
Statutory expiry
31 Mar 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Major dwellings

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026