Sunnyfield, 7 George Road, Milford-on-Sea SO41 0RT Data via plota.co.uk

26/10938 - Full Planning Permission Registered

Proposal

Single-storey side extension and removal of window on first floor Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
✓
Validated
7 Oct 2026
✓
Consultation
9 Oct 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 25 Nov 2026, from New Forest (District)'s recent extensions.

Comments are open until 6 Nov 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
Hovercraft in the Solent. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Local nature reserve 190 m away: Milford on Sea
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 618 m away: Navitus Bay Wind Park
The site is 618 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Inside the Milford on Sea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 10 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £375,000 in February 2014. Semi-detached house, freehold.

28 February 2014£375,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area153 m² (1,647 sq ft)
Energy ratingC (69 out of 100), could reach B
PropertySemi-detached house, 7 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas, Boiler and underfloor heating, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in November 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SO41 0RT
Received
1 Oct 2026
Validated
7 Oct 2026
Ward
Milford & Hordle
Parish
Milford-On-Sea
Case officer
Show
Target decision
2 Dec 2026
Applicant
Show
Agent
Nua Architecture and Interior Design Ltd

Decision outlook

Day 21 of the 56-day target. New Forest (District) usually decides extensions by day 49.

Day 2135 days to the 56-day target
78%decided within 8 weeks
93%approved
535decided in the last year

Plota live figures for extensions decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15250216
Planning Portal ref
PP-15250216
Consultation
9 Oct 2026
Comments by
6 Nov 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.