2026, Observation Applications, Not in Brent Data via plota.co.uk

26/2018 - Observations-Other Boroughs Applications Decided

Proposal

Location: Frogmore Industrial Estate, Acton Lane, London, Park Royal, NW10 7NQ Proposal: Demolition of existing boundary walls and retaining walls, removal of existing hardstanding, removal of redundant drainage infrastructure, diversion of below ground services, soil remediation works, earthworks to regrade site levels, installation of piling mat and construction of piles, installation of hoardings,and installation of demountable site management buildings Ref: Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
Decision
Target date was 18 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 83.

The consultation period closed on 14 Sept 2026.

Site constraints 6

Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wembley
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
2 listed buildings within 150 m of the postcode pin; Inside the Brent built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Observations-Other Boroughs Applications
Received
7 Aug 2026
Validated
7 Aug 2026
Case officer
Show
Target decision
18 Sept 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Old Oak and Park Royal Development Corporation

Decision outlook

Day 83, past the statutory target. 95% of demolitions in Brent are decided within thirteen weeks, which runs to 6 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 8327 days past the 56-day target
73%decided within 8 weeks
75%approved
287decided in the last year

Plota live figures for demolitions decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
14 Sept 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026