Central Scotland 400kV Upgrade (XL Route) Data via plota.co.uk
Description
Increase the operating voltage of the 10.5km long section of overhead line between the downleads at tower XL001A, grid reference and mid span beyond XL033 at Blairingone, grid reference , from 275 to 400 kilovolts (kV) to enable an increase in its capacity; Reconductor (i.e. changing the wires) between towers XL12 and XL20 as part of increasing the operating voltage of XL route; Construct four new overhead line towers to turn in and connect XL route to the proposed Kincardine North Substation; Remove one existing overhead line tower (XL05); and Install temporary masts to divert one circuit of XL route to enable construction of towers and removal of existing tower. Associated access works, scaffolding, working areas, laydown areas and pulling positions for conductors. Data via plota.co.uk
Last checked
Decision outlook
Plota predicts a decision between 18 Nov 2026 and 27 Nov 2026, from recent full applications across the UK.
Day 35 of the 56-day target. Councils usually decide full applications by day 56.
Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Energy Consents Unit (Scottish Government) to go on. Energy Consents Unit (Scottish Government) decision record →
Site constraints 2
Checked on 20 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Energy Consents Unit (Scottish Government) - and every UK council - as a live feed, an API, or a bulk CSV export.
Referenced application