26/01108/FULMAJ - Full Major Application Under Consideration

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission dated 23 December 2025, to vary condition 6 (access to terraces) to reflect amended configuration of terraces and balconies, condition 20 (basement plans) to reflect amended basement layouts, condition 31 (biodiversity gain plan), to reflect amended landscaping and planting, condition 57 (cycle parking), to amend long stay and short stay cycle parking provision, condition 67 (fire strategy) to reflect amended fire strategy, condition 73 (floor areas) to reflect amended floor areas and layout reconfiguration, condition 74 (approved plans), to include an extension of the proposed building to the south with the introduction of inset balconies, extension of basement level B2, reconfiguration of the proposed plant and the formation of a ground floor colonnade with new pedestrian route, and condition 76 (height of the building) to increase the height of the proposed building and accompanying deed of variation to the section 106 agreement to vary planning obligations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Consultation
14 Aug 2026
Decision
Expected by 2 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 2 Nov 2026.

The consultation period closed on 9 Oct 2026.

Documents 138

Statements & assessments 47

PDF ATTACHMENTSUMMARY Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 6 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 8 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 26 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 27 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 28 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 29 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 30 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 2 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 13 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 14 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 15 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 16 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 17 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 18 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 9 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 3 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 4 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 22 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 23 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 24 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 25 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-YT-10004 - TA ADDENDUM - P04 Report - Transport Statement/Report · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-YS-10005_P00 WHOLE LIFE CARBON ASSESSMENT - SECTION 73 UPDATE (21J Other · 3 Aug 2026 View ↗ PDF 024829-R05-C PLANNING NOISE REPORT ADDENDUM Report - Acoustic/Noise Report · 3 Aug 2026 View ↗ PDF 260730 - HIGH HOLBORN PLANNING STATEMENT Report - Planning Statement/Report · 3 Aug 2026 View ↗
PDF Commenter’s name hidden Show Other · 3 Aug 2026 View ↗
PDF 294009-ARP-RP-YS-10007 CIRCULAR ECONOMY STATEMENT _SECTION 73 Other · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 19 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 20 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 1 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 10 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 12 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 11 OF 30_COMPRESSED Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 21 OF 30_COMPRESSED Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 7 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT ADDENDUM PART 5 OF 30 Report - Design & Access Statement/Report · 3 Aug 2026 View ↗ PDF 94009-ARP-RP-M-10001 HH ENERGY STATEMENT - STAGE 3 WITH COVER Other · 3 Aug 2026 View ↗ PDF APPENDIX A1 - OVERHEATING ASSESSMENT (UPDATE) Other · 3 Aug 2026 View ↗ PDF APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE GREEN BRUKL) Other · 3 Aug 2026 View ↗ PDF APPENDIX A4 - ENERGY ASSESSMENT OUTPUTS (BE LEAN BRUKL) Other · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-YE-10005 - EQIA - STATEMENT OF CONFORMITY_REVP02 Other · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-YF-10001_FIRE STATEMENT MMA UPDATE-S2 P05 Other · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-C-10002_FLOOD RISK ASSESSMENT AND SUDS STRATEGY_ADDENDUM Accompanying report · 3 Aug 2026 View ↗ PDF 294009-ARP-RP-YE-10006 - HIA - STATEMENT OF CONFORMITY REV P02 Other · 3 Aug 2026 View ↗ PDF HIHOL.02 HIGH HOLBORN ADDENDUM HERITAGE STATEMENT Accompanying report · 3 Aug 2026 View ↗ PDF SUSTAINABLE DEVELOPMENT AND CLIMATE CHANGE REPORT ADDENDUM Accompanying report · 3 Aug 2026 View ↗

Plans & drawings 72

PDF BAY 5C -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 6A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 5D -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 4C -TYPICAL SET-BACK BAY Drawing · 3 Aug 2026 View ↗ PDF RAILINGS -PROPOSED SITE PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 4 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 5 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 6 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 7 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF URBAN GREENING FACTOR Drawing · 3 Aug 2026 View ↗ PDF LEVEL 06 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 06 PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 07 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 07 PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 08 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 08 PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 09 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 09 PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 10 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 10 PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF GROUND FLOOR GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF GROUND FLOOR LANDSCAPE SECTION Drawing · 3 Aug 2026 View ↗ PDF GROUND FLOOR PLANTING PLAN Drawing · 3 Aug 2026 View ↗ PDF LEVEL 01-05 GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF ROOF TERRACES LANDSCAPE SECTIONS Drawing · 3 Aug 2026 View ↗ PDF P21906-00-001-GIL-0000 Drawings Schedule · 3 Aug 2026 View ↗ PDF ILLUSTRATIVE GENERAL ARRANGEMENT PLAN Drawing · 3 Aug 2026 View ↗ PDF 260730 - HIGH HOLBORN - SECTION 73 APPLICANT COVERING LETTER Cover Letter · 3 Aug 2026 View ↗ PDF HOL-MAK-XX-ZZ-DR-AR-080000 Site Plan · 3 Aug 2026 View ↗ PDF HOL-MAK-XX-ZZ-DR-AR-080001 Site Plan · 3 Aug 2026 View ↗ PDF 22.07.26_HIGH_HOLBORN_DEVELOPMENT_CIRCULAR_ECONOMY_GLA_SPREADSHEET_SECTION 73 Other · 3 Aug 2026 View ↗ PDF PROPOSED SECTION C-C Drawing · 3 Aug 2026 View ↗ PDF PROPOSED SECTION D-D Drawing · 3 Aug 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 3 Aug 2026 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 3 Aug 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 3 Aug 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 3 Aug 2026 View ↗ PDF BAY 1A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 1B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 2A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 2B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 3A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 3B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 4A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 4B-TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 5A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 5B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 6B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 7A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 7B -TYPICAL SET-BACK BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 8A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 8B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 9A -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF BAY 9B -TYPICAL FACADE BAY Drawing · 3 Aug 2026 View ↗ PDF RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_DEMOLITION Drawing · 3 Aug 2026 View ↗ PDF RAILINGS FIXED TO STAPLE INN BUILDINGS NORTH AND SOUTH_PROPOSED Drawing · 3 Aug 2026 View ↗ PDF HOL-MAK-XX-ZZ-SH-AR-070100 Drawings Schedule · 3 Aug 2026 View ↗ PDF PROPOSED GROUND FLOOR Drawing · 3 Aug 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN MEZZANINE Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 1 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 2 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 3 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 8 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 9 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL 10 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED BASEMENT LEVEL 1 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED BASEMENT LEVEL 2 FLOOR PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED LEVEL ROOF PLAN Drawing · 3 Aug 2026 View ↗ PDF PROPOSED SITE PLAN Site Plan · 3 Aug 2026 View ↗ PDF PROPOSED SECTION A-A Drawing · 3 Aug 2026 View ↗ PDF PROPOSED SECTION B-B Drawing · 3 Aug 2026 View ↗ PDF HIGH_HOLBORN_DEVELOPMENT_WLC_GLA SPREADSHEET (SECTION 73 UPDATE JUL 2026) Other · 3 Aug 2026 View ↗

Consultation & comments 1

PDF Commenter’s name hidden Show Public Comment · 12 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 13

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 463 m away: Thames Tideway Tunnel
The site is about 463 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 992 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Conservation area about 0 m away: Chancery Lane
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
26 listed buildings within 150 m of the postcode pin
Nearest: Gatehouse Fronting on to High Holborn, Gray's Inn, Grade II, about 51 m from the postcode pin · 6 Grade I, 4 Grade II*, 16 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 26 with distances
Historic England ↗
Registered park or garden about 89 m away: Gray's Inn
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Scheduled monument about 188 m away: Barnard's Inn Hall (Mercers' School); Wider setting of protected view 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 50 m away: New Oxford Street; Designated open space about 46 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Major Application
Postcode
WC1V 7PU
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
Farringdon Without
Case officer
Show
Target decision
2 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Newmark

Public comments

2comments received
1 objecting1 neutral

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15090032
Planning Portal ref
PP-15090032
Neighbours
11 Sept 2026
Consultation
14 Aug 2026
Comments by
9 Oct 2026
Site or press notice
21 Aug 2026
Statutory expiry
2 Nov 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Major dwellings

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026