9 Chestnut Close Snaith East Riding Of Yorkshire DN14 9HD Data via plota.co.uk

25/03476/PLF - Full Planning Permission Approved

Proposal

Erection of first floor extension to side Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Dec 2025
✓
Validated
16 Dec 2025
✓
Approved
5 Feb 2026

Approved on 5 Feb 2026 · Delegated Decision · Last checked 3 Oct 2026

Site constraints 3

National infrastructure project 345 m away: Thorpe Marsh Gas Pipeline
The site is 345 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: East Coast Hydrogen Humber Pipeline (at pre-application, 1284 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Snaith built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £120,000 in April 2011. Semi-detached house, freehold.

1 April 2011£120,000
31 July 2000£46,000
31 May 1996£50,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area79 m² (850 sq ft)
Energy ratingC (74 out of 100), could reach B
PropertySemi-detached house, 5 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in January 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
DN14 9HD
Received
11 Dec 2025
Validated
16 Dec 2025
Ward
Snaith, Airmyn & Rawcliffe & Marshland
Parish
Snaith And Cowick Town Council
Case officer
Show
Target decision
10 Feb 2026
Decision
Approve
Decision date
5 Feb 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Chris Finn Architect

How this decision compares

Decided in 51 days from validation, about the council's usual 54 days. Approved, as 90% of full applications here are.

89%decided within 8 weeks
90%approved
1,510decided in the last year

Plota live figures for full applications decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14558805
Planning Portal ref
PP-14558805
Comments by
30 Jan 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.