Langford Primary School Gilstead Road, London, SW6 2LG Data via plota.co.uk

P/2026/02362/FUL - Full Planning Application REGISTERED: Under Consultation

Proposal

Alterations to the Langford Primary School (Courtyard Building) to include; installation of new foul water connections, to include minor groundworks and small diameter service penetrations through external walls; installation of CCTV cameras and associated cabling and conduit; repairs to roof; repair of existing accessible toilet to include replacement of plywood floorboards, vinyl flooring, and wall plasterboard, and installation of new pipes/gully; repair of internal timber arches; repairs to damaged plasterboard; associated external and internal works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
✓
Validated
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Nov 2026 and 8 Dec 2026, from Hammersmith and Fulham's recent extensions.

Comments are open until 29 Oct 2026

Comment on this application ↗

Documents 22

All documents on the council site ↗

Site constraints 7

Grade II listed: Langford School Including Wall, Railings, Gates and Entrances, and Former School Keeper's House and Special School
List entry 1393408 · 20 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Designated open space 39 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 2LG
Received
11 Sept 2026
Validated
15 Sept 2026
Ward
Sands End
Case officer
Show
Applicant
Show
Freehold owner
Show

Decision outlook

Day 44 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 75.

Day 4431 days to the predicted decision (day 75)
25%decided within 8 weeks
98%approved
385decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
1 Oct 2026
Comments by
29 Oct 2026
Site or press notice
7 Oct 2026
Statutory expiry
10 Nov 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use