Orchard Cottage Lodge Farm Aunby Hamlet Road Aunby Lincolnshire PE9 4EE Data via plota.co.uk

S26/1771 - Full Planning Permission Awaiting decision

Proposal

Change of use of annex to C3 dwellinghouse Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Sept 2026
Decision
Expected by 19 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Nov 2026 and 18 Dec 2026, from South Kesteven's recent changes of use.

Comments are open until 4 Nov 2026

Comment on this application ↗

Site constraints 5

Priority habitat: Traditional orchard
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 23 m away: Mallard Pass Solar Project
The site is 23 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area102 m² (1,098 sq ft)
Energy ratingA (99 out of 100)
PropertyDetached bungalow
Built2014
HeatingBoiler & underfloor, oil
WallsAverage thermal transmittance 0.15 W/m²K

From the energy performance certificate lodged in November 2014, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE9 4EE
Received
24 Sept 2026
Validated
24 Sept 2026
Ward
Glen Ward
Parish
Careby, Aunby & Holywell Parish Council
Case officer
Show
Target decision
19 Nov 2026
Applicant
Show

Decision outlook

Day 34 of the 56-day target. South Kesteven usually decides changes of use by day 80.

Day 3446 days to the predicted decision (day 80)
17%decided within 8 weeks
83%approved
67decided in the last year

Plota live figures for changes of use decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 20 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
00008244
Comments by
4 Nov 2026
Statutory expiry
19 Nov 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Change of use

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use