Land south of the Black Horse Pub Binsted Lane Binsted BN18 0LP Data via plota.co.uk

Proposal

Siting of 6 No. glamping pods with associated structures, access, car parking and landscaping (retrospective). This application may affect the setting of a listed building and is in CIL Zone 3 (Zero Rated) as other development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jul 2026
✓
Validated
27 Jul 2026
Decision
Expected by 23 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 74.

The consultation period closed on 16 Sept 2026.

Site constraints 4

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National park 105 m away: South Downs
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
Radon affected area, class 3; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Arun - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Arun
Postcode
BN18 0LP
Received
20 Jul 2026
Validated
27 Jul 2026
Parish
Walberton
Case officer
Show
Target decision
23 Oct 2026
Applicant
Show

Decision outlook

Day 74, past the statutory target. 96% of listed building works in Arun are decided within thirteen weeks, which runs to 26 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 7418 days past the 56-day target
71%decided within 8 weeks
86%approved
60decided in the last year

Plota live figures for listed building works decided by Arun in the last twelve months, from validation. Arun decision record →

Consultation & key dates

Comments by
16 Sept 2026
Arun
Planning Authority Score
8.9/10
Excellent
#4 of 296 councils
Relevant to this application:
Householder decisions

Arun is one of the fastest councils in England for householder decisions, ranking #2 out of 296. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Arun decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #187 of 296
94%
Householder approved
Above avg (90%) #97 of 296
99%
Decided in 8 weeks
Above avg (63%) #2 of 296
12%
Extended time limit
Below avg (41%) #4 of 296
45%
Minor dwellings approved
66 decided (1-9 homes)
75%
Major dwellings approved
20 decided (10+ homes)
86%
Change of use approved
35 decided
794
Total decisions
113 refused in the year to March 2026