8, Basement And Ground Floors, York Way, London, N1 9AA Data via plota.co.uk

P2026/1350/FUL - Full Planning Application Approved

Proposal

Alterations to the existing front façade including installation of a new glazed shopfront system with double entrance doors and low stall riser to No. 6, replacement sliding panel opening to match the proportions of the existing shopfront at No. 8, and installation of new fascia signage and projecting hanging signs associated with updated branding. Advertisement Consent Ref: P2026/1351/ADV also submitted. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Jun 2026
✓
Validated
23 Jun 2026
✓
Consultation
3 Sept 2026
✓
Approved
7 Oct 2026

Approved on 7 Oct 2026 · Delegated · Last checked 8 Oct 2026

Associated applications 2

Site constraints 25

Article 4 directionCritical Drainage Group3_006Local Plan Strategic and Development Management Policies - Policy B1 DeliveringCAZCentral Activities ZoneIslington LU Zones of InterestCrossrail 2Local Plan Strategic and Development Management Policies - Policy B2 New businesChannel Tunnel Rail LinkParliament Hill summit to St Paul's CathedralThe Cally Liveable NeighbourhoodSite within 100m of a TLRN RoadSite within 100m of a SRN RoadKing's CrossC
King's Cross conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 2A.1 Parliament Hill summit to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
11 listed buildings within 150 m
Nearest: Kings Cross Station, Grade I, 22 m away · 1 Grade I, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Critical Drainage Group3_006Council record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy B1 DeliveringCouncil record
Recorded by the council for this site.
Council site ↗
CAZCouncil record
Recorded by the council for this site.
Council site ↗
Central Activities ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Islington LU Zones of InterestCouncil record
Recorded by the council for this site.
Council site ↗
Crossrail 2Council record
Recorded by the council for this site.
Council site ↗
Local Plan Strategic and Development Management Policies - Policy B2 New businesCouncil record
Recorded by the council for this site.
Council site ↗
Channel Tunnel Rail LinkCouncil record
Recorded by the council for this site.
Council site ↗
Parliament Hill summit to St Paul's CathedralCouncil record
Recorded by the council for this site.
Council site ↗
The Cally Liveable NeighbourhoodCouncil record
Recorded by the council for this site.
Council site ↗
Site within 100m of a TLRN RoadCouncil record
Recorded by the council for this site.
Council site ↗
Site within 100m of a SRN RoadCouncil record
Recorded by the council for this site.
Council site ↗
King's CrossCouncil record
Recorded by the council for this site.
Council site ↗
CCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Local nature reserve 455 m away: Camley Street Nature Park; Inside the Islington built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 27 m away: King's Cross/ St Pancras; National infrastructure project 1809 m away: London Strategic Heat Main Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Full Planning Application
Postcode
N1 9AA
Received
19 Jun 2026
Validated
23 Jun 2026
Ward
Caledonian
Case officer
Show
Target decision
13 Aug 2026
Decision
Approve with conditions
Decision date
7 Oct 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 106 days from validation, 54 days slower than Islington's median of 52 for extensions. Approved, as 94% of extensions here are.

60%decided within 8 weeks
94%approved
688decided in the last year

Plota live figures for extensions decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-14963073
Comments by
26 Sept 2026
Site or press notice
3 Sept 2026
Statutory expiry
8 Sept 2026
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026