Riverbank At The North End Of Washford Mill Weir, Between The River Dane And Riverdane Road, Congleton, Cheshire East Data via plota.co.uk

26/3727/FUL - Full Planning Pending Consideration

Proposal

Low-head mini-hydropower installation involving intake works, pipeline, Archimedes Screw turbine, and control shed, also including the buried power cable to Siemens plc Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
✓
Validated
27 Oct 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Dec 2026 and 9 Feb 2027, from Cheshire East's recent utility and infrastructure works.

Comments are open until 26 Nov 2026

Comment on this application ↗

Site constraints 6

Grade II listed: Flint Mill (Central Part of Higher Washford Mill)
List entry 1330335 · 22 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Flood defence 2 m away (natural high ground, designed for a 1 in 5 year flood); Registered park or garden 182 m away: Congleton Park; Inside the Congleton built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning
Received
14 Oct 2026
Validated
27 Oct 2026
Ward
Congleton West
Parish
Congleton
Target decision
22 Dec 2026
Decision level
Delegation
Applicant
Show

Decision outlook

Day 2 of the 56-day target. Cheshire East usually decides utility and infrastructure works by day 82.

Day 280 days to the predicted decision (day 82)
35%decided within 8 weeks
92%approved
6%go to committee

Plota live figures for utility and infrastructure works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Comments by
26 Nov 2026
Statutory expiry
22 Dec 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 councils
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026