Land of 1 Duncan Road, Ashley, New Milton BH25 5AW Data via plota.co.uk

26/10822 - Full Planning Permission Refused

Proposal

Detached bungalow Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
25 Aug 2026
✓
Consultation
28 Aug 2026
✗
Refused
20 Oct 2026
Appeal
Not lodged

Refused on 20 Oct 2026 · Delegated · Last checked 21 Oct 2026

Documents 24

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
National park 265 m away: New Forest; Inside the Ashley (New Forest) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
BH25 5AW
Received
24 Aug 2026
Validated
25 Aug 2026
Ward
Ashley, Bashley & Fernhill
Parish
New Milton
Case officer
Show
Target decision
20 Oct 2026
Decision
Refused
Decision date
20 Oct 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 56 days from validation, 8 days faster than New Forest (District)'s median of 64 for new homes. Refused, as 50% of new homes here are.

43%decided within 8 weeks
50%approved
47decided in the last year

Plota live figures for new homes decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

2comments received
2 objecting

5 neighbours consulted · Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
28 Aug 2026
Comments by
25 Sept 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026