Land at Elveden Road Bridge over the A3 Esher Bypass Fairmile Estate Elmbridge Data via plota.co.uk

2026/2310 - Full Application Registered

Proposal

Replacement of existing 1.1m parapet with 1.8m high parapet, new footway, traffic calming measures and associated works to Elveden Road Bridge over the A3 Esher Bypass. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Sept 2026
✓
Validated
7 Oct 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 2 Dec 2026 and 15 Dec 2026, from Elmbridge's recent commercial and major works.

Site constraints 6

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve about 355 m away: Old Common (Map to Be Verified); National infrastructure project about 1520 m away: M25 junction 10/A3 Wisley interchange improvement; Green belt about 8 m away: London; Priority habitat about 9 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 10 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Full Application
Received
25 Sept 2026
Validated
7 Oct 2026
Ward
Cobham and Downside Ward

Decision outlook

Day 12 of the 56-day target. Elmbridge usually decides commercial and major works by day 64.

Day 1252 days to the predicted decision (day 64)
42%decided within 8 weeks
61%approved
39decided in the last year

Plota live figures for commercial and major works decided by Elmbridge in the last twelve months, from validation. Elmbridge decision record →

Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 councils
Relevant to this application:
Householder decisions

Elmbridge ranks #195 out of 296 councils for householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026