Bow Business Centre Bow House, 157 Bow Road, London E3 Data via plota.co.uk
Proposal
Proposed refurbishment and fire safety improvement works comprising the replacement of the existing external wall render system with a new non-combustible fa�ade system; replacement of plastic extract vent grilles with aluminium grilles; installation of automatic opening vents (AOVs) to the central escape stair, sixth floor, and west stair core (replacing an existing Crittall window); replacement of terrace roof coverings with a liquid-applied membrane; and installation of enlarged rainwater outlets to improve terrace drainage. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 12 Nov 2026 and 10 Dec 2026, from Tower Hamlets's recent commercial and major works.
Documents 23
Statements & assessments 4
Plans & drawings 13
Application forms 1
Other documents 5
Site constraints 8
Show all 12 with distances
- 0 mFormer Poplar Town Hall (Bow House)Grade II
- 35 m2-22, Fairfield Road E3Grade II
- 49 mBromley Public HallGrade II
- 58 mArea RailingsGrade II
- 60 m163, Bow Road E3Grade II
- 105 mRoman Catholic Church of Our Lady and St Catherine of SienaGrade II
- 118 mSeven Bollards
- 119 mGentlemen's Public Convenience at Bromley-by-Bow Adjacent to Statue of We GladstoneGrade II
- 134 mStatue of We Gladstone at West End of St Mary's ChurchyardGrade II
- 135 m2 Bollards (Between Statue of We Gladstone and St Mary's Churchyard EntranceGrade II
- 139 mIron Railings, Gates and Gate Piers to Churchyard of St Mary's ChurchGrade II
- 142 mMonument to Joseph Dawson in the Churchyard of St Mary BowGrade II
Checked on 15 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Caxton Hall Community Centre & Adjoining Land, Caxton Grove, E3 2EE
Submission of Details pursuant to Condition 40 (All Non-Road Mobile Machinery (N...
Caxton Hall Community Centre & Adjoining Land, Caxton Grove, E3 2EE
Submission of Details pursuant to Condition 18 (Sustainable Urban Drainage Schem...
4 and 4A Towcester Road, London, E3 4ND
Submission of details pursuant to condition no.17 (stage 1 written scheme of inv...
Area Bound To The North By The Eastway (part), A12 East Cross Route (part), The River Lea, The Northern And Eastern Boundary Of East Marsh, New Spitalfields Market, Ruckholt Road And Temple Mill Lane; To The East By The Temple Mills Lane, The Lea Valley Line Overground Railway Line, Land To The East Of Leyton Road, Angel Lane, Part Of The Great Eastern Line Until Stratford Regional Station, The Lea Valley Overground Railway Line And A Section Of The Northern Part Of Stratford City Development Site; To The South By Part Of The Northern Boundary Of The Stratford City Development Site, Land To The North And South Of The Western End Of The Channel Tunnel Rail Link Box, Part Of The Land Within The Western Boundary Of Stratford City Development Site, The Southern Section Of The Rail Loop Which Connects The North London Line And The Great Eastern Line, The Main Line Railway And Land On The Eastern Bank Of The Waterworks River, The Greenway (part), High Street Stratford (A11), Rick Roberts Way And Including Land To The East Of Canning Road, West Of The North London Line, And South And West Of West Ham Station, The Land Between Bow Back River And Barbers Road And Part Of The Great Eastern Line; To The West By The A12 Blackwall Tunnel Northern Approach Road (part) The River Lea And The River Lea Navigation (Hackney Cut) And Land On The Western Bank Of The River Lea To The East Of The A12 East Cross Route. A12, Hackney, E20
Submission of details pursuant to condition LCS0.204 of planning permission 11/9...
Caxton Hall Community Centre & Adjoining Land, Caxton Grove, E3 2EE
Submission of Details pursuant to Condition 12 (Sufficient Ducting Space for Ful...
Flat 2, Enard House, 1 Cardigan Road, London, E3 5HY
Installation of a bicycle storage locker
Important details
- Council
- Tower Hamlets
- Application type
- Full Planning Permission
- Received
- 10 Sept 2026
- Validated
- 10 Sept 2026
- Ward
- Bow East
- Case officer
- Show
- Target decision
- 5 Nov 2026
- Decision level
- Delegated
- Applicant
- Show
- Agent
- M D Bithrey Surveyors Ltd
Decision outlook
Day 50 of the 56-day target. Tower Hamlets usually decides commercial and major works by day 69.
Plota live figures for commercial and major works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →
Consultation & key dates
- Neighbours
- 21 Sept 2026
- Consultation
- 21 Sept 2026
- Comments by
- 12 Oct 2026
- Site or press notice
- 29 Sept 2026
- Statutory expiry
- 5 Nov 2026
- Env. assessment
- No
Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Track this application
Bow Business Centre Bow House, 157 Bow Road, London E3
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 12 Oct 2026.