Mill Ponds Mill Lane Rayne Essex CM77 6AH Data via plota.co.uk

26/02362/HH Pending Consideration

Proposal

Construction of outbuilding. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Oct 2026
✓
Validated
21 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 12 Dec 2026, from Braintree's recent extensions.

Comments are open until 11 Nov 2026

Comment on this application ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 18 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 186 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 186 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 186 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 330 m away: Tetney Blow Wells SSSI; Inside the Tetney built-up area; Priority habitat 11 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Postcode
CM77 6AH
Received
13 Oct 2026
Validated
21 Oct 2026
Target decision
16 Dec 2026

Decision outlook

Day 7 of the 56-day target. Braintree usually decides extensions by day 52.

Day 749 days to the 56-day target
84%decided within 8 weeks
89%approved
481decided in the last year

Plota live figures for extensions decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Comments by
11 Nov 2026
Statutory expiry
16 Dec 2026
Braintree
Planning Authority Score
7/10
Good
#61 of 296 councils
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications, ranking #47 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026