Morrisons Petrol Cloverfield Hinckley Leicestershire LE10 1YD Data via plota.co.uk

26/00880/FUL - Full Application Awaiting decision

Proposal

Removal of the existing jet wash and air and vacuum units, extension to the existing petrol filling station's sales building to facilitate a hot food takeaway (ancillary to the Sui Generis petrol filling station), installation of kitchen extraction equipment, provision of lockers, new air and vacuum units, bin store and associated forecourt works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 7 Dec 2026 and 29 Dec 2026, from Hinckley and Bosworth's recent changes of use.

Comments are open until 5 Nov 2026

Comment on this application ↗

Site constraints 3

National infrastructure project 854 m away: Hinckley National Rail Freight Interchange
The site is 854 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hinckley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 8 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hinckley and Bosworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LE10 1YD
Received
5 Oct 2026
Validated
5 Oct 2026
Ward
Hinckley Trinity
Parish
Hinckley
Case officer
Show
Target decision
30 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
CarneySweeney

Decision outlook

Day 23 of the 56-day target. Hinckley and Bosworth usually decides changes of use by day 70.

Day 2347 days to the predicted decision (day 70)
31%decided within 8 weeks
86%approved
38decided in the last year

Plota live figures for changes of use decided by Hinckley and Bosworth in the last twelve months, from validation. Hinckley and Bosworth decision record →

Consultation & key dates

Alt. reference
PP-15056550
Planning Portal ref
PP-15056550
Comments by
5 Nov 2026
Statutory expiry
30 Nov 2026
Env. assessment
No
Hinckley and Bosworth
Planning Authority Score
2.8/10
Poor
#238 of 296 councils
Relevant to this application:
Householder decisions

Hinckley and Bosworth is one of the slowest councils in England for householder decisions, ranking #273 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hinckley and Bosworth decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #154 of 296
94%
Householder approved
Above avg (90%) #109 of 296
37%
Decided in 8 weeks
Below avg (63%) #273 of 296
56%
Extended time limit
Above avg (41%) #254 of 296
65%
Minor dwellings approved
46 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
86%
Change of use approved
21 decided
520
Total decisions
63 refused in the year to March 2026