The John Jenkins Stadium Moneyfield Avenue Portsmouth PO3 6LA Data via plota.co.uk

26/01007/NMA - Non-Material Amendment Approved

Proposal

Application for non-material amendment to planning permission to seek approval of construction of an electricity substation and enclosure and resiting of cycle parking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2026
✓
Approved
7 Oct 2026

Approved on 7 Oct 2026 · Fully Delegated Decision · Last checked 7 Oct 2026

Associated applications 4

  • Part of

    FullApprovedcouncil archive

    Conditions , 13, decided (outcome not recorded)

    • Variationarchive
      • AmendmentApplication for non-material amendment to seek approval of construction of an electricity…This application26/01007/NMA

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1129 m away: Hampshire Water Transfer and Water Recycling Project; Radon affected area, class 3; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Non-Material Amendment
Postcode
PO3 6LA
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
Baffins
Case officer
Show
Target decision
29 Sept 2026
Decision
Approve
Decision date
7 Oct 2026
Decision level
Fully Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15195625
Planning Portal ref
PP-15195625
Statutory expiry
29 Sept 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026