Burstwick Country Golf Club Ellifoot Lane Burstwick East Riding Of Yorkshire HU12 9EF Data via plota.co.uk

26/00936/PLF - Full Planning Permission Approved

Proposal

Change of use of land for siting of holiday lodges including construction of associated road, infrastructure and footpath link to golf course clubhouse Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
29 Apr 2026
✓
Approved
13 Aug 2026
✓
Consultation
14 Aug 2026

Approved on 13 Aug 2026 · Delegated Decision · Last checked 19 Aug 2026

Documents 29

Consultation & comments 13

PDF . NATURE CONSERVATION OFFICER Consultee Comment · 8 Jun 2026 View ↗
PDF Commenter’s name hidden Show Consultee Comment · 28 May 2026 View ↗
PDF BURSTWICK PARISH COUNCIL Consultee Comment · 28 May 2026 View ↗ PDF PARISH COUNCIL Consultee Comment · 27 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 26 May 2026 View ↗
PDF ENVIRONMENT AGENCY Consultee Comment · 14 May 2026 View ↗
PDF Commenter’s name hidden Show Consultee Comment · 12 May 2026 View ↗
PDF NATURAL ENGLAND Consultee Comment · 11 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 9 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 8 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 6 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 6 May 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 6 May 2026 View ↗

All documents on the council site ↗

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 270 m away: Humber Hydrogen Pipeline, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area276 m² (2,971 sq ft)
Energy ratingD (asset rating 94)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in October 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU12 9EF
Received
15 Apr 2026
Validated
29 Apr 2026
Ward
Mid Holderness
Parish
Burstwick Parish Council
Case officer
Show
Target decision
14 Aug 2026
Decision
Approve
Decision date
13 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Doug Jennings Planning Services

How this decision compares

Decided in 106 days from validation, 51 days slower than East Riding's median of 55 for changes of use. Approved, as 77% of changes of use here are.

85%decided within 8 weeks
77%approved
165decided in the last year

Plota live figures for changes of use decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

6comments received
6 supporting

100% support · above the UK average of 16%

6 neighbours consulted · Last counted 19 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14858610
Planning Portal ref
PP-14858610
Neighbours
14 Aug 2026
Consultation
14 Aug 2026
Comments by
24 Jun 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Change of use

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.