Brompton Regis Road, Brompton Regis, Dulverton, TA22 9NN Data via plota.co.uk

EXM/26/133/LBC - Listed Building Consent Approved

Proposal

Listed building consent for the proposed installation of 14 No.solar panels on listed outbuilding. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jun 2026
✓
Validated
15 Jun 2026
✓
Approved
10 Aug 2026

Approved on 10 Aug 2026 · Delegated · Last checked 6 Sept 2026

Site constraints 7

Special area of conservation
Exmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument about 44 m away: Lock up 60m south-east of the Church of St Mary
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
4 listed buildings within 150 m of the postcode pin
Nearest: Methodist Church, Railings and Dwarf Wall on West Front, Grade II, about 45 m from the postcode pin · 1 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Special area of conservationCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exmoor
Application type
Listed Building Consent
Postcode
TA22 9NN
Received
4 Jun 2026
Validated
15 Jun 2026
Case officer
Show
Target decision
10 Aug 2026
Decision
Approved with Conditions
Decision date
10 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
Landsense Professional Ltd

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 100% of listed building works here are.

61%decided within 8 weeks
100%approved
5%go to committee

Plota live figures for listed building works decided by Exmoor in the last twelve months, from validation. Exmoor decision record →

Public comments

1comment received
1 neutral

Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
17 Jun 2026
Comments by
17 Jul 2026
Statutory expiry
10 Aug 2026
Exmoor
Planning Authority Score
4.4/10
Below average
#179 of 296 councils
Relevant to this application:
Other decisions

Exmoor is slower than most councils at deciding householder applications, ranking #248 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Exmoor decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #10 of 296
98%
Householder approved
Above avg (90%) #15 of 296
47%
Decided in 8 weeks
Below avg (63%) #248 of 296
52%
Extended time limit
Above avg (41%) #234 of 296
100%
Minor dwellings approved
4 decided (1-9 homes)
96%
Change of use approved
26 decided
174
Total decisions
7 refused in the year to March 2026