P/2026/02025/DET - Details to Meet Conditions Full/Outline REGISTERED: Under Assessment

Proposal

Submission of details of the proposed hard and soft landscape works and details of the integrated children's playspace features, pursuant to Condition 15; details of external artificial lighting, pursuant to Condition 28; details of safe, secure and accessible bicycle storage, pursuant to Condition 40 of planning permission reference: dated 5th May 2026. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2026
✓
Validated
13 Aug 2026
Decision
Target date was 8 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 8 Oct 2026.

The consultation period closed on 22 Sept 2026.

Documents 64

Plans & drawings 61

PDF 079-PAD-903 Bike store and green roof detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-100 Landscape masterplan with bike store locations(rev 6).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-Brook-Green-Landscape-Maintenance-Plan-2.pdf Other Reports · 5 Aug 2026 View ↗ PDF 079-PAD-806 Hedge planting plan and detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-807 Detailed planting plan 7 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-808 Detailed planting plan 8 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-809 Detailed planting plan 9 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-810 Typical tree planting detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-811 Climbing planting wiring fixing elevation (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-812 Terrace planter plan (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-813 Terrace planter section (rev P2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-100 Landscape masterplan (rev 6).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-101 Detail Plan - Secret garden (rev 3).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-102 Detail Plan - Parking and Entrance (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-103 Detail Plan- Garden entrance (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-104 Detail Plan - Arrival garden (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-105 Detail plan - Sunken garden (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-106 Detail plan - Second arrival (rev 3).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-107 Detail plan - ASHP (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-108 Detail plan - Wellbeing garden (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-109 Detail plan - Sauna garden (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-110 Detail plan - Private terraces (rev 4).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-111 Landscape material plan (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-115 Detail plan - Site entrance (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-116 Detail plan - Parking and entrance 1 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-117 Detail plan - Bike store (rev 3).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-120 Landscape materials plan (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-260 Typical bin store (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-262 Private terrace boundary detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-263 Typical planting tree detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-265 Typical paving detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-266 Entrance sauna garden detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-267 Typical planter detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-268 Railing detail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-269 Secret garden entrance feature (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-300 Finishes and edging details (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-303 Paving setting out - Ramp and entrance (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-304 Stepping stones detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-306 Paving setting out - private terraces (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-400 Building 1 main entrance steps (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-401 Building 1 main entrance ramp (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-403 Lawn seating wall detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-404 Typical raised brick planter (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-501 Private front garden typical railing detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-502 Private rear terrace boundary fence detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-504 ASHP Screening fence detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-505 Typical gate detail (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-603 Secret garden wet stone option - plan and section (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-700 Log stepping blocks (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-701 Play Trail (rev 1).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-702 Boulders (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-703 Natural play wall (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-704 Pebble path (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-705 Boulders plan (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-800 Tree planting plans (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-801 Detailed planting plan 1 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-802 Detailed planting plan 2 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-803 Detailed planting plan 3 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-804 Detailed planting plan 4 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF 079-PAD-805 Detailed planting plan 5 of 9 (rev 2).pdf Drawing · 5 Aug 2026 View ↗ PDF XAL_DWG_XX_REV02_160726 Proposed plans for exterior lighting.pdf Drawing · 5 Aug 2026 View ↗

All documents on the council site ↗

Associated applications 9

Site constraints 7

Brook Green conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 494 m away: Thames Tideway Tunnel
The site is 494 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
4 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £26,708,000 in September 2024. Other property, freehold.

4 September 2024£26,708,000Recorded as a transfer outside a standard sale
30 January 2019£4,850,000Recorded as a transfer outside a standard sale. One of 2 sales recorded that day
30 January 2019£19,008,442Recorded as a transfer outside a standard sale. One of 2 sales recorded that day

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area864 m² (9,300 sq ft)
Energy ratingD (asset rating 82)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in August 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Details to Meet Conditions Full/Outline
Postcode
W6 7BJ
Received
5 Aug 2026
Validated
13 Aug 2026
Ward
Brook Green
Case officer
Show
Applicant
Show
Agent
Alex Spooner / London Square Developments Ltd
Freehold owner
Show

Consultation & key dates

Consultation
13 Aug 2026
Comments by
22 Sept 2026
Statutory expiry
8 Oct 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Major dwellings

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.