93B High Street, Wealdstone, Harrow, HA3 5DL Data via plota.co.uk

PL/2725/26 - Full Planning Application Pending Consideration

Proposal

Conversion of second floor flat into two flats (1 x 1 bed & 1 x 2 beds); alterations and extension to roof to form end gable; rear dormer; external alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
✓
Validated
15 Oct 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Dec 2026, from Harrow's recent extensions.

Site constraints 6

Grade II listed: War Memorial
List entry 1389404 · 30 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Air quality management area: Harrow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wealdstone
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Harrow built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area67 m² (721 sq ft)
Energy ratingE (39 out of 100), could reach D
PropertyMid-terrace flat, 3 habitable rooms
Built1930 to 1949
HeatingElectric storage heaters
WallsTimber frame, as built, no insulation (assumed)

From the energy performance certificate lodged in February 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Harrow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harrow
Application type
Full Planning Application
Postcode
HA3 5DL
Received
14 Oct 2026
Validated
15 Oct 2026
Ward
Wealdstone South
Case officer
Show
Target decision
10 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
Vitcoplanning

Decision outlook

Day 13 of the 56-day target. Harrow usually decides extensions by day 56.

Day 1343 days to the 56-day target
80%decided within 8 weeks
79%approved
1,936decided in the last year

Plota live figures for extensions decided by Harrow in the last twelve months, from validation. Harrow decision record →

Consultation & key dates

Statutory expiry
10 Dec 2026
Harrow
Planning Authority Score
4.9/10
Below average
#153 of 296 councils
Relevant to this application:
Householder decisions

Harrow ranks #115 out of 296 councils for householder decision speed. Harrow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Harrow decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #273 of 296
83%
Householder approved
Below avg (90%) #261 of 296
71%
Decided in 8 weeks
Above avg (63%) #115 of 296
33%
Extended time limit
Below avg (41%) #77 of 296
44%
Minor dwellings approved
133 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
38%
Change of use approved
26 decided
1,330
Total decisions
298 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.