Power Station 132 Manchester Road Carrington Manchester M31 4AY Data via plota.co.uk
Proposal
Installation of a purpose-built Protection and Control Room building with associated equipment and minor works. Data via plota.co.uk
Application progress
Approved on 3 Sept 2026 · Delegated Decision · Last checked 10 Sept 2026
Documents 9
Decision & officer reports 2
Plans & drawings 3
Application forms 2
Site constraints 4
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Trafford - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
1 Station Cottages Manchester Road Partington Manchester M31 4BW
Application for approval of details reserved by conditions of grant of planning ...
Land West Of Manchester Road Manchester Road Carrington Manchester M31 4QN
Construction of a 1400MW (2800MWh) Battery Energy Storage System (BESS) facility...
Carrington Plains 130 Manchester Road Carrington Manchester M31 4QR
Erection of new building structures to create a timber pallet repair and storage...
Nearby new applications
Power Station 132 Manchester Road Carrington Manchester M31 4AY
Application for non-material amendment to planning permission (114439/FUL/24) to...
Carrington Plains 130 Manchester Road Carrington Manchester M31 4QR
Erection of new building structures to create a timber pallet repair and storage...
Power Station 132 Manchester Road Carrington Manchester M31 4AY
Application for non-material amendment (114439/FUL/24) to allow for extended hou...
Important details
- Council
- Trafford
- Application type
- Full Application
- Postcode
- M31 4AY
- Received
- 24 Jun 2026
- Validated
- 3 Aug 2026
- Ward
- Bucklow St Martins
- Parish
- Carrington Parish Council
- Decision
- Approve with Conditions
- Decision date
- 3 Sept 2026
- Decision level
- Delegated Decision
How this decision compares
Decided in 31 days from validation, 30 days faster than Trafford's median of 61 for commercial and major works. Approved, as 89% of commercial and major works here are.
Plota live figures for commercial and major works decided by Trafford in the last twelve months, from validation. Trafford decision record →
Public comments
No public comments yet.
Last counted 10 Sept 2026
Consultation & key dates
- Alt. reference
- PP-14966710
- Planning Portal ref
- PP-14966710
- Consultation
- 4 Aug 2026
- Comments by
- 25 Aug 2026
- Env. assessment
- No
Historical activity at this location
50 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Trafford ranks #120 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).
Track this application
Power Station 132 Manchester Road Carrington Manchester M31 4AY
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →