Zone B - Corunna Aldershot Urban Extension Alisons Road Aldershot Hampshire Data via plota.co.uk

26/00428/REVPP - Removal/Variation of Condition via PP Registered

Proposal

MINOR MATERIAL AMENDMENT: Variation of condition 2 (Approved Plans) of Reserved Matters Permission ref: dated 20/08/2019 for Phase 2 infrastructure works associated with Corunna Development Zone B, including surface finishes and landscaping, to allow for dropped kerbs, private drive crossovers and associated highway frontage arrangements serving the approved Pennefathers Development Zone G residential development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Validated
7 Aug 2026
✓
Consultation
7 Aug 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 6 Nov 2026.

The consultation period closed on 1 Sept 2026.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2 variation sought

    • VariationMINOR MATERIAL AMENDMENT: Variation of condition 2 (Approved Plans)This application26/00428/REVPP

Site constraints 3

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 128 m away: Odiham Common with Bagwell Green and Shaw SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
3 listed buildings within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Removal/Variation of Condition via PP
Received
29 Jul 2026
Validated
7 Aug 2026
Ward
Wellington
Case officer
Show
Target decision
6 Nov 2026
Decision level
delegated chairman
Applicant
Show
Agent
Savills (UK) Limited

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15088952
Planning Portal ref
PP-15088952
Consultation
7 Aug 2026
Comments by
1 Sept 2026
Site or press notice
11 Aug 2026
Statutory expiry
6 Nov 2026
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 councils
Relevant to this application:
Householder decisions

Rushmoor is one of the fastest councils in England for householder decisions, ranking #22 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025