Application progress

✓
Received
25 Aug 2026
✓
Validated
9 Oct 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 30 Nov 2026, from East Riding's recent signs and adverts.

Comments are open until 9 Nov 2026

Comment on this application ↗

Site constraints 3

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 846 m away: Peartree Hill Solar Farm
The site is 846 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Dogger Bank South Offshore Wind Farms (decided, 1535 m); Dogger Bank Creyke Beck (decided, 1881 m); Dogger Bank D Wind Farm (at pre-application, 728 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Beverley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Consent to Display an Advertisement
Postcode
HU17 0JT
Received
25 Aug 2026
Validated
9 Oct 2026
Ward
Minster And Woodmansey
Parish
Beverley Town Council
Case officer
Show
Target decision
4 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Sovereign Signs

Decision outlook

Day 19 of the 56-day target. East Riding usually decides signs and adverts by day 52.

Day 1937 days to the 56-day target
96%decided within 8 weeks
88%approved
77decided in the last year

Plota live figures for signs and adverts decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 20 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15181370
Planning Portal ref
PP-15181370
Comments by
9 Nov 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Other decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026