RAKE COTTAGE, Rake Lane, Hawarden, Deeside, CH5 3PN Data via plota.co.uk

FUL/000745/26 - Full - Building Works Recommendation made

Proposal

New Garage and Storage Space Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Validated
7 Sept 2026
Decision
Expected by 2 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from Flintshire's recent extensions.

The consultation period closed on 6 Oct 2026.

Site constraints 15

Coal mining legacy areaAir Safeguarding Consult BAE Birdstrike HazardAir Safeguarding Consult BAE New Telecoms AppAir Safeguarding Consult BAE Structures 15m+County Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthAreas of Advertisement ControlDevelopment Control South TeamFlood Map Surface and Water Courses Flood Zone 2Flood Map Surface and Water Courses Flood Zone 3
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 360 m away: HyNet Carbon Dioxide Pipeline
The site is 360 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hynet North West Hydrogen Pipeline (at pre-application, 360 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Coal mining legacy areaCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE Birdstrike HazardCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE New Telecoms AppCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE Structures 15m+Council record
Recorded by the council for this site.
Council site ↗
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
Areas of Advertisement ControlCouncil record
Recorded by the council for this site.
Council site ↗
Development Control South TeamCouncil record
Recorded by the council for this site.
Council site ↗
Flood Map Surface and Water Courses Flood Zone 2Council record
Recorded by the council for this site.
Council site ↗
Flood Map Surface and Water Courses Flood Zone 3Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 4; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area124 m² (1,335 sq ft)
Energy ratingC (69 out of 100), could reach A
PropertyDetached house, 7 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, oil
WallsSolid brick, with internal insulation

From the energy performance certificate lodged in May 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Full - Building Works
Postcode
CH5 3PN
Received
4 Sept 2026
Validated
7 Sept 2026
Ward
Flintshire Ward Hawarden Mancot
Parish
Flintshire Community Hawarden Community Council
Case officer
Show
Target decision
2 Nov 2026
Decision level
DEL Delegated - Officer
Applicant
Show
Agent
Design Planning

Decision outlook

Day 51 of the 56-day target. Flintshire usually decides extensions by day 51.

Day 515 days to the 56-day target
81%decided within 8 weeks
94%approved
225decided in the last year

Plota live figures for extensions decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-15203515
Comments by
6 Oct 2026
Site or press notice
15 Sept 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.