Plota predicted a decision around 9 Oct 2026; it is now day 86.
Day 86, past the statutory target. 75% of commercial and major works in Westmorland and Furness are decided within thirteen weeks, which runs to 14 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 24 Aug 2026.
target
predicted
Day 8630 days past the 56-day target
41%decided within 8 weeks
96%approved
48decided in the last year
Plota live figures for commercial and major works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →
Site constraints 5
Foxfield to Greenodd across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
Special protection area about 361 m away: Morecambe Bay and Duddon Estuary; 3 listed buildings within 150 m of the postcode pin; SSSI about 362 m away: South Walney and Piel Channel Flats SSSI; Inside the Barrow-in-Furness built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Work with planning data?
Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.
Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).