1 Aviary Cottages Frogmore Windsor SL4 2JQ Data via plota.co.uk

26/00800/LBC - Listed Building Consent Approved

Proposal

Consent to remove existing floor slab and replace with new limecrete floor slab, remove dividing wall between existing kitchen and living room, installation of mechanical ventilation to bathroom and replacement of existing cast iron guttering with like for like material and appearance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Mar 2026
✓
Validated
22 Apr 2026
✓
Approved
7 Aug 2026

Approved on 7 Aug 2026 · Delegated · Last checked 7 Aug 2026

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Registered park or garden: The Royal Estate, Windsor: Windsor Castle and Home Park
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Wood pasture and parkland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
5 listed buildings within 150 m
Nearest: Prince Albert's Dairy and Cottage, Grade II*, 39 m away · 1 Grade I, 1 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Also on the record
National infrastructure project 1737 m away: M4 Junctions 3 to 12 Smart Motorway.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
SL4 2JQ
Received
27 Mar 2026
Validated
22 Apr 2026
Ward
Old Windsor
Parish
Windsor Unparished
Case officer
Show
Target decision
16 Jun 2026
Decision
Application Permitted
Decision date
7 Aug 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 107 days from validation, 54 days slower than Windsor and Maidenhead's median of 53 for extensions. Approved, as 75% of extensions here are.

77%decided within 8 weeks
75%approved
835decided in the last year

Plota live figures for extensions decided by Windsor and Maidenhead in the last twelve months, from validation. Windsor and Maidenhead decision record →

Consultation & key dates

Alt. reference
PP-14816585
Planning Portal ref
PP-14816585
Statutory expiry
16 Jun 2026
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 councils
Relevant to this application:
Other decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications, ranking #82 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026