Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale, Rossendale Data via plota.co.uk
Proposal
Construction and operation of 12 wind turbines with a maximum height to the tip of the blade of 180 metres (above ground level), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm (Further Environmental Information). Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 8 Nov 2026 and 20 Nov 2026, from recent other across the UK.
Documents 1
Consultation & comments 1
Site constraints 7
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Rochdale - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Important details
Decision outlook
Day 11 of the 56-day target. Councils usually decide other by day 48.
Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Rochdale to go on. Rochdale decision record →
Public comments
No public comments yet.
Last counted 29 Sept 2026
Rochdale is slower than most councils at deciding householder applications, ranking #215 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
Track this application
Land At And Adjacent To Scout Moor Wind Farm Rossendale And Rochdale, Rossendale
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.