Land Between Park View And Cloister Road Western Avenue Acton W3 6XZ Data via plota.co.uk

254805NMA - Non-Material Amendment Approved

Proposal

Application for a Non-Material Amendment (S96a) to planning permission ref: dated: 07.06.2024 for 'Minor material amendment (S.73) to vary conditions 2, 11, 18, 20, 21, 22,23 and 25 and delete condition 19 pursuant to planning permission reference dated 13/09/2023 for "Redevelopment of the Site including the erection of 6 residential buildings ranging in height from ground +1 to ground + 16 floors to provide a total of 300 new homes (use class C3) (affordable and private), with public and private amenity spaces including roof top gardens and play spaces; servicing; disabled car parking; bike and bin stores; resident gym; concierge and associated spaces. With associated highways works, and landscaping works along Western Avenue". Variation seeks to reword conditions 2, 11, 18, 20, 21, 22, 23 and 25; and deletion of condition 19.' Amendments seek changes to wordings of conditions 17, 18b, 28b, 33, 36c, 36d, 39b, 47 and to reinstate condition 48. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Approved
23 Feb 2026

Approved on 23 Feb 2026 · Delegated Decision · Last checked 4 Oct 2026

Associated applications 17

Site constraints 5

Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1699 m away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Non-Material Amendment
Postcode
W3 6XZ
Received
22 Dec 2025
Validated
22 Dec 2025
Ward
North Acton
Case officer
Show
Target decision
18 Jan 2026
Decision
Grant with Conditions
Decision date
23 Feb 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Newsteer Real Estate Advisers

How this decision compares

Decided in 63 days from validation, 29 days slower than Ealing's median of 34 for amendments. Approved, as 84% of amendments here are.

72%decided within 8 weeks
84%approved
131decided in the last year

Plota live figures for amendments decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 4 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14584681
Planning Portal ref
PP-14584681
Statutory expiry
18 Jan 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026