Land outside of 31 Elizabeth Road Hereford HR5 3BX Data via plota.co.uk

P261702/PDV - Permitted Development Approved

Proposal

Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Jun 2026
✓
Approved
11 Jun 2026

Approved on 11 Jun 2026 · Last checked 18 Oct 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
2 listed buildings within 150 m
Nearest: Olde Tavern, Grade II, 52 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Inside the Kington built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Permitted Development
Postcode
HR5 3BX
Received
8 Jun 2026
Validated
8 Jun 2026
Ward
Kington
Parish
Kington
Target decision
6 Jul 2026
Decision
No Comment
Decision date
11 Jun 2026

How this decision compares

Decided in 3 days from validation, 11 days faster than Herefordshire's median of 14 for utility and infrastructure works. Approved, as 93% of utility and infrastructure works here are.

81%decided within 8 weeks
93%approved
153decided in the last year

Plota live figures for utility and infrastructure works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
10 Jun 2026
Site or press notice
10 Jun 2026
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 councils
Relevant to this application:
Householder decisions

Herefordshire is slower than most councils at deciding householder applications, ranking #250 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026