26/01250/PAD - Consent to Display an Advertisement Approved

Proposal

Display of 1 no. internally illuminated high level fascia sign and 1 no. internally illuminated projecting fascia sign to front Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 May 2026
✓
Validated
8 Jun 2026
✓
Approved
30 Jul 2026

Approved on 30 Jul 2026 · Delegated Decision · Last checked 26 Sept 2026

Licence at this address

  • Licence Route 1033 Premises licence · in force · elsewhere in the building Hours not given on the register
    Food hygiene rating: 3 (Generally satisfactory)Inspected 29 Jan 2026

Licensed hours are what the licence permits, not opening times.

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 152 m away: Greater Wash
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
2 listed buildings within 150 m; Inside the Withernsea built-up area; National infrastructure project 1957 m away: Humber Hydrogen Pipeline, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Consent to Display an Advertisement
Postcode
HU19 2HH
Received
15 May 2026
Validated
8 Jun 2026
Ward
South East Holderness
Parish
Withernsea Town Council
Case officer
Show
Target decision
3 Aug 2026
Decision
Approve
Decision date
30 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 52 days from validation, about the council's usual 52 days. Approved, as 88% of signs and adverts here are.

96%decided within 8 weeks
88%approved
77decided in the last year

Plota live figures for signs and adverts decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 26 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14927892
Planning Portal ref
PP-14927892
Comments by
8 Jul 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Other decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026