St James Hospital Locksway Road Southsea Data via plota.co.uk

25/00636/VOC - Variation/Removal of Condition Awaiting decision

Proposal

Application to vary condition 2 of planning consent to amend the approved plans. Revision includes internal alterations to conversion properties, reduction in used roofspace, fewer rooflights and dormers, and provision of mezzanine floors. Existing roads and car parking have been retained to the west and northeast of the site. New Build Houses 50 - 58 have been relocated to avoid existing below-ground extension at the rear to relocate the kitchen Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jun 2025
✓
Validated
25 Jul 2025
✓
Consultation
28 Jul 2025
Decision
Target date was 24 Oct 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 460.

The consultation period closed on 22 Aug 2025.

Documents 61

Plans & drawings 40

PDF 127-00-1120-F - PUBLIC CYCLE ROUTES Drawing · 21 Jan 2026 View ↗ PDF DRAWING 177-00-1120-F - PUBLIC CYCLE ROUTES Drawing · 12 Dec 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN REV G Report · 20 Nov 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN REV G Report · 7 Nov 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN REV G Report · 7 Nov 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN REV G Report · 7 Nov 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN (CEMP) REV F Report · 1 Oct 2025 View ↗ PDF CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN REV F RECEIVED 11/09/25 Report · 19 Sept 2025 View ↗ PDF 127-00-1101-N_PROPOSED SITE PLAN Drawing · 25 Jul 2025 View ↗ PDF 127-00-1102-M_HOUSE TYPES SITE PLAN Drawing · 25 Jul 2025 View ↗ PDF 127-00-1103-L_REFUSE AND CYCLES Drawing · 25 Jul 2025 View ↗ PDF 127-00-1105-M_BOUNDARY Drawing · 25 Jul 2025 View ↗ PDF 127-00-1107-O_PHASING Drawing · 25 Jul 2025 View ↗ PDF 127-00-1112-I_PARKING Drawing · 25 Jul 2025 View ↗ PDF 127-01-1010-E_SJH_TURNER_PROPOSED PLANS Drawing · 25 Jul 2025 View ↗ PDF 127-01-1011-E_SJH_GODDARD_PROPOSED PLANS Drawing · 25 Jul 2025 View ↗ PDF 127-01-1022-E_SJH_PROPOSED PLAN SJH SECOND FLOOR Drawing · 25 Jul 2025 View ↗ PDF 127-01-1021-E_SJH_PROPOSED PLAN SJH FIRST FLOOR Drawing · 25 Jul 2025 View ↗ PDF 127-01-1020-E_SJH_PROPOSED PLAN SJH GROUND FLOOR Drawing · 25 Jul 2025 View ↗ PDF 127-01-1018-F_SJH_HALL_PROPOSED PLANS Drawing · 25 Jul 2025 View ↗ PDF 127-01-1014-D_SJH_EXBURY_PROPOSED PLANS Drawing · 25 Jul 2025 View ↗ PDF 127-01-1013-D_SJH_LOWRY_PROPOSED PLANS_SHEET 2 OF 2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1013-D_SJH_FERNHURST_PROPOSED PLANS Drawing · 25 Jul 2025 View ↗ PDF 127-01-1012-D_SJH_LOWRY_PROPOSED PLANS_SHEET 1 OF 2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1121-E_SJH_PROPOSED ELEVATIONS HALL Drawing · 25 Jul 2025 View ↗ PDF 127-01-1117-D_SJH_PROPOSED ELEVATIONS EXBURY 2OF2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1116-C_SJH_PROPOSED ELEVATIONS EXBURY 1OF2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1115-D_SJH_PROPOSED ELEVATIONS FERNHURST Drawing · 25 Jul 2025 View ↗ PDF 127-01-1114-D_SJH_PROPOSED ELEVATIONS LOWRY Drawing · 25 Jul 2025 View ↗ PDF 127-01-1113-D_SJH_PROPOSED ELEVATIONS GODDARD Drawing · 25 Jul 2025 View ↗ PDF 127-01-1112-D_SJH_PROPOSED ELEVATIONS TURNER 2OF2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1111-D_SJH_PROPOSED ELEVATIONS TURNER 1OF2 Drawing · 25 Jul 2025 View ↗ PDF 127-01-1024-C_SJH_PROPOSED PLAN SJH ROOF PLAN Drawing · 25 Jul 2025 View ↗ PDF 127-01-1023-E_SJH_PROPOSED PLAN SJH THIRD FLOOR Drawing · 25 Jul 2025 View ↗ PDF 127-21-1001-D_OXLADE Drawing · 25 Jul 2025 View ↗ PDF 127-22-1001-D_HARRISON Drawing · 25 Jul 2025 View ↗ PDF 127-22-1002-A_HARRISON_2 Drawing · 25 Jul 2025 View ↗ PDF 127-27-1001-A_BANDSTAND Drawing · 25 Jul 2025 View ↗ PDF 127-00-1001-A_LOCATION PLAN OS Extract · 5 Jun 2025 View ↗ PDF ST JAMES PORTSMOUTH_S73 SUMMARY NOTES_MAY 2025 Drawing · 5 Jun 2025 View ↗

All documents on the council site ↗

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 381 m away: AQUIND Interconnector
The site is 381 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 763 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
1 listed building within 150 m
Nearest: St James Hospital and Attached Piers and Lamp Posts, Grade II, 40 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,833 m² (30,494 sq ft)
Energy ratingB (asset rating 37)
UseResidential Institutions: Hospitals and Care Homes
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in October 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Variation/Removal of Condition
Received
4 Jun 2025
Validated
25 Jul 2025
Ward
Milton
Case officer
Show
Target decision
24 Oct 2025
Decision level
Delegated
Applicant
Show

Decision outlook

Day 460, past the statutory target. 80% of amendments in Portsmouth are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Oct 2026.

Day 460404 days past the 56-day target
62%decided within 8 weeks
87%approved
5%go to committee

Plota live figures for amendments decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

1comment received
1 objecting

393 neighbours consulted · Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14055009
Planning Portal ref
PP-14055009
Neighbours
28 Jul 2025
Consultation
28 Jul 2025
Comments by
22 Aug 2025
Site or press notice
1 Aug 2025
Statutory expiry
24 Oct 2025
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.