Lillie Road Shops,2-14 Lillie Road, and the rear gardens of 14 Lillie Road and 7-11 Empress Place,London,SW6 1TU Data via plota.co.uk

P/2026/02656/ADV - Advertisement REGISTERED: Under Consultation

Proposal

The continued display of 7 externally illuminated fascia signs and 6 non-illuminated projecting wall signs at 2-14 Lillie Road, and 1 illuminated painted graphic sign at 10 Lillie Road. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Oct 2026
✓
Validated
19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Dec 2026 and 31 Dec 2026, from Hammersmith and Fulham's recent signs and adverts.

Comments are open until 25 Nov 2026

Comment on this application ↗

Site constraints 10

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1082 m away: Thames Tideway Tunnel; Registered park or garden 108 m away: Brompton Cemetery; 2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Designated open space 4 m away; Conservation area 99 m away: Philbeach.
Not affected
Not green belt · No scheduled monument at the site

Checked on 27 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement
Postcode
SW6 1TU
Received
16 Oct 2026
Validated
19 Oct 2026
Ward
West Kensington
Case officer
Show
Applicant
Show
Agent
Caroline McIntyre / Spring Planning Ltd

Decision outlook

Day 9 of the 56-day target. Hammersmith and Fulham usually decides signs and adverts by day 65.

Day 956 days to the predicted decision (day 65)
36%decided within 8 weeks
94%approved
70decided in the last year

Plota live figures for signs and adverts decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
26 Oct 2026
Comments by
25 Nov 2026
Site or press notice
4 Nov 2026
Statutory expiry
14 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026