Refreshments Kiosk, Nfdc Car Park Hordle Cliff, Cliff Road, Milford-on-Sea Data via plota.co.uk

26/10819 - Lawful Development Certificate proposed Refused

Proposal

Steel framed canopy with glass roof to refreshement kiosk (Lawful Development Certificate that permission is not required for proposal) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Aug 2026
✓
Validated
26 Aug 2026
✗
Refused
5 Oct 2026
Appeal
Not lodged

Refused on 5 Oct 2026 · Delegated · Last checked 6 Oct 2026

Site constraints 10

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Article 4 direction
Hovercraft in the Solent. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Local nature reserve 72 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 8 m away: Highcliffe to Milford Cliffs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Maritime cliff and slope
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Inside the Milford on Sea built-up area; Priority habitat 11 m away: Maritime cliff and slope; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Lawful Development Certificate proposed
Received
24 Aug 2026
Validated
26 Aug 2026
Ward
Milford & Hordle
Parish
Milford-On-Sea
Case officer
Show
Target decision
21 Oct 2026
Decision
Was Not Lawful
Decision date
5 Oct 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 40 days from validation, 16 days faster than New Forest (District)'s median of 56 for commercial premises. Refused, as 14% of commercial premises here are.

60%decided within 8 weeks
86%approved
6%go to committee

Plota live figures for commercial premises decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

No public comments yet.

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15170323
Planning Portal ref
PP-15170323
Comments by
25 Sept 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions