South Cattleholmes White Dike Nafferton East Riding Of Yorkshire YO25 8NW Data via plota.co.uk

26/01610/AGNOT - Prior Approval Agricultural Development Approved

Proposal

Construction of replacement unmade hardstanding apron with a concrete apron for access purposes Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2026
✓
Approved
20 Jul 2026

Approved on 20 Jul 2026 · Delegated Decision · Last checked 27 Jul 2026

Site constraints 2

National infrastructure project: Yorkshire and Humber CCS Cross Country Pipeline
The site is inside the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Project Four Offshore Wind Farm (decided, 1397 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area27 m² (291 sq ft)
Energy ratingD (asset rating 77)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval Agricultural Development
Postcode
YO25 8NW
Received
23 Jun 2026
Validated
23 Jun 2026
Ward
East Wolds And Coastal
Parish
Harpham Parish Council
Case officer
Show
Target decision
21 Jul 2026
Decision
Prior Approval Not Required
Decision date
20 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Harrison Pick Ltd

How this decision compares

Decided in 27 days from validation, 26 days faster than East Riding's median of 53 for extensions. Approved, as 88% of extensions here are.

97%decided within 8 weeks
88%approved
754decided in the last year

Plota live figures for extensions decided by East Riding in the last twelve months, from validation. East Riding decision record →

Consultation & key dates

Alt. reference
PP-15030937
Planning Portal ref
PP-15030937
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.