Barn Adjacent To Vine Cottage Horse Shoe Lane Barholm Lincolnshire PE9 4RA Data via plota.co.uk

S26/0634 - Full Planning Permission Refused

Proposal

Replacement of Collyweston slate roof at the barn, with concrete tiles to match Vine Cottage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Apr 2026
✓
Validated
28 Apr 2026
✗
Refused
4 Aug 2026
Appeal
Not lodged

Refused on 4 Aug 2026 · Delegated Decision · Last checked 4 Aug 2026

Site constraints 5

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
4 listed buildings within 150 m
Nearest: Leigh Cottage, Grade II, 34 m away · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Scheduled monument 155 m away: Dovecote at Barholm Old Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
National infrastructure project 1780 m away: Mallard Pass Solar Project; Priority habitat 46 m away: Good quality semi improved grassland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
PE9 4RA
Received
10 Apr 2026
Validated
28 Apr 2026
Ward
Casewick Ward
Parish
Barholm & Stowe Parish Meeting
Case officer
Show
Target decision
23 Jun 2026
Decision
Refused
Decision date
4 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Richardson

How this decision compares

Decided in 98 days from validation, 36 days slower than South Kesteven's median of 62 for extensions. Refused, as 7% of extensions here are.

42%decided within 8 weeks
93%approved
327decided in the last year

Plota live figures for extensions decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Public comments

2comments received
1 objecting1 neutral

7 neighbours consulted · Last counted 4 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13318619
Planning Portal ref
PP-13318619
Comments by
4 Aug 2026
Statutory expiry
23 Jun 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 councils
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications, ranking #262 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026