27 Avro Way Brooklands Industrial Park Weybridge Surrey KT13 0YU Data via plota.co.uk

2026/1945 - Non-Material Amendments Approved

Proposal

Non-Material Amendment to 2026/0476 to relocate DNO enclosure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Approved
2 Sept 2026

Approved on 2 Sept 2026 · Last checked 12 Sept 2026

Associated applications 2

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Brooklands conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Brooklands
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Non-Material Amendments
Postcode
KT13 0YU
Received
7 Aug 2026
Validated
7 Aug 2026
Ward
Weybridge St Georges Hill Ward
Decision
Non Material Amendment - Accept Amendment
Decision date
2 Sept 2026
Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 councils
Relevant to this application:
Householder decisions

Elmbridge ranks #195 out of 296 councils for householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026