PLN/2026/1547 - Full planning permission Under Consultation

Proposal

The proposed supply and installation of external condenser units, installation of 3No dual 11kVA EV charging point and the replacement of the existing bike shelter for 20 Space Amazon Eco Two Tier Shelter Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Jul 2026
✓
Validated
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 26 Nov 2026, from Milton Keynes's recent utility and infrastructure works.

Documents 12

All documents on the council site ↗

Site constraints 4

2 Article 4 directions
Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Non immediate direction · Article 4 Direction relating to Houses in Multiple Occupation (HIMO) - Immediate direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Inside the Milton Keynes built-up area; National infrastructure project about 1900 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Milton Keynes - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
MK10 0BP
Received
21 Jul 2026
Validated
15 Sept 2026
Ward
Walton
Parish
Kents Hill, Monkston and Brinklow
Case officer
Show
Target decision
10 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 43 of the 56-day target. Milton Keynes usually decides utility and infrastructure works by day 60.

Day 4317 days to the predicted decision (day 60)
45%decided within 8 weeks
92%approved
44decided in the last year

Plota live figures for utility and infrastructure works decided by Milton Keynes in the last twelve months, from validation. Milton Keynes decision record →

Public comments

2comments received
2 neutral

Last counted 27 Oct 2026

Read the comments on the council site ↗

Milton Keynes
Planning Authority Score
7.1/10
Good
#59 of 296 councils
Relevant to this application:
Householder decisions

Milton Keynes is faster than most councils at deciding householder applications, ranking #52 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Milton Keynes decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #156 of 296
92%
Householder approved
Above avg (90%) #159 of 296
78%
Decided in 8 weeks
Above avg (63%) #52 of 296
28%
Extended time limit
Below avg (41%) #45 of 296
55%
Minor dwellings approved
66 decided (1-9 homes)
83%
Major dwellings approved
23 decided (10+ homes)
71%
Change of use approved
49 decided
1,088
Total decisions
134 refused in the year to March 2026