Coombe Boys School College Gardens New Malden KT3 6NT Data via plota.co.uk
Proposal
Details required for Condition 10 (Drainage Scheme Evidence) of planning permission (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.) dated 16/01/2024. Variation to consist of Removal of Air Source Heat Pump (ASHP) and Relocation of Ground Source Heat Pump (GSHP), Removal of retaining wall & stairs (north of NB01), Removal of green roof , Change in main temporary teaching block layout.) Data via plota.co.uk
Application progress
Refused on 30 Jan 2026 · Delegated Decision · Last checked 3 Oct 2026
Documents 4
Decision & officer reports 1
Statements & assessments 2
Application forms 1
Associated applications 14
Part of
Conditions , , , variation sought
- Variationarchive
Conditions 8, 23, 24, 31, 32 discharged · 10, 25 refused · 26 varied
- ConditionsDetails required for Condition 10 (Drainage Scheme Evidence)RefusedThis application25/03139/CLC
Show 11 more · 6 approved, 1 pending, 3 refused, 1 withdrawn
- VariationApplication under Section 73 of the Town and Country Planning Act 1990 to vary Conditions 10…26/00923/FUL
Conditions 10 awaiting decision
Site constraints 4
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in November 2025, the latest held for this property. The building may have changed since. View the certificate
Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Coombe Boys School College Gardens New Malden KT3 6NU
Application for a Non-Material Amendment to Planning Permission ref: 26/00923/FU...
61 Malden Way New Malden KT3 6DX
Application for a Non-Material Amendment to Planning Permission ref: 22/00495/FU...
9A Malden Park New Malden KT3 6AS
T1: Oak - Crown reduce by up to 2m in all aspects near to the previous points an...
65A Cromwell Avenue New Malden KT3 6DN
Erection of rear dormer roof extension with installation of front rooflights to ...
14 Blakes Avenue New Malden KT3 6RL
T1 - Robinia pseudoacacia - 3 meter Crown reduction.
Coombe Boys School College Gardens New Malden KT3 6NU
Details required for Condition 10 (Photo and Installation of Sustainable Drainag...
Important details
- Council
- Kingston upon Thames
- Application type
- Details Reserved by Condition
- Postcode
- KT3 6NU
- Received
- 5 Dec 2025
- Validated
- 5 Dec 2025
- Ward
- Motspur Park & Old Malden East
- Parish
- New And Old Malden
- Case officer
- Show
- Target decision
- 30 Jan 2026
- Decision
- Refuse
- Decision date
- 30 Jan 2026
- Decision level
- Delegated Decision
- Applicant
- Show
- Agent
- Show
Public comments
No public comments yet.
Last counted 3 Oct 2026
Consultation & key dates
- Alt. reference
- PP-14491320
- Planning Portal ref
- PP-14491320
- Consultation
- 7 Jan 2026
- Comments by
- 28 Jan 2026
- Statutory expiry
- 30 Jan 2026
- Env. assessment
- No
Historical activity at this location
36 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Coombe Boys School College Gardens New Malden KT3 6NT
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Coombe Boys School College Gardens New Malden KT3 6NT
Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 10 (Sustainable Drainage Scheme) and 28 (Biodiversity and Nature Conservation) and removal of Condition 34 (Green roof) for Application Reference Number: 23/01623/FUL (Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including…
- Received
- 4 Jun 2024
- Outcome
- Pending
- Type
- Full
Coombe Boys School College Gardens New Malden KT3 6NU
Demolition of Existing blocks EFAA, EFAB, EFAC, EFAD, EFAE, EFAG and EFAH, consequential works to retained Block EFAF, and erection of two replacement three-storey school buildings including temporary teaching blocks to be used during the construction period, along with access, landscaping, and associated infrastructure.
- Received
- 19 Jun 2023
- Decided
- 16 Jan 2024
- Outcome
- Approved