Kentlands Princes Drive Sandwich Bay Sandwich CT13 9PZ Data via plota.co.uk

26/00927 - Listed Building Consent Awaiting decision

Proposal

Main House works: Removal of existing infill panels & replacement with new. Replacement of glazing (Loggia). Replacement of fittings & cladding of exterior door (Butlery). Reopening of blocked door opening & removal & replacement of partition wall to 1st floor. Alterations to partitions to 1st floor bathroom. Introduction of internal mechanical ventilation heat system. 3no. new leaded windows & new brick plinth to E elevation, Repair and part replacement of timber frame structure (Butlery). 6no. new windows to W elevation & 3no. new windows to E elevation of main house. 4no external ducts inserted at roof level. Replacement boundary treatment to external courtyard including reinstatement of wall and arched gateway. Lodge works: Removal of existing infill panels & replacement with new. Replacement of external boiler room door to S elevation. Introduction of entrance door in existing opening to S elevation. Repair and part replacement of timber frame structure. enlargement of existing opening and replace 1no door and replace 5no windows to N elevation. New rainwater goods. Replacement internal door and partitions to ground floor. 2no external ducts inserted at roof level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
✓
Validated
2 Oct 2026
✓
Consultation
23 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Nov 2026, from Dover's recent extensions.

Site constraints 9

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 25 m away: Thanet Coast & Sandwich Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
1 listed building within 150 m
Nearest: Kentlands and the Lodge, Grade II, 4 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
SSSI 25 m away: Sandwich Bay to Hacklinge Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Flood defence 32 m away (embankment, designed for a 1 in 100 year flood); Priority habitat 30 m away: Coastal vegetated shingle.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 10 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area401 m² (4,316 sq ft)
Energy ratingF (34 out of 100), could reach E
PropertyDetached house, 15 habitable rooms
BuiltPre-1900
HeatingBoiler and radiators, mains gas
WallsTimber frame, as built, no insulation (assumed)

From the energy performance certificate lodged in April 2009, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Listed Building Consent
Postcode
CT13 9PZ
Received
1 Oct 2026
Validated
2 Oct 2026
Ward
Sandwich
Parish
WORTH
Case officer
Show
Target decision
27 Nov 2026
Applicant
Show
Agent
Studio Sam Causer Ltd

Decision outlook

Day 26 of the 56-day target. Dover usually decides extensions by day 55.

Day 2630 days to the 56-day target
84%decided within 8 weeks
93%approved
314decided in the last year

Plota live figures for extensions decided by Dover in the last twelve months, from validation. Dover decision record →

Public comments

No public comments yet.

Last counted 25 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
23 Oct 2026
Statutory expiry
27 Nov 2026
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 councils
Relevant to this application:
Other decisions

Dover is one of the fastest councils in England for householder decisions, ranking #28 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.