2024/1416 - Full Approved at committee

Approved at planning committee on 18 February 2026. The council has not issued its decision notice yet.

Proposal

Change of use from Agricultural and Equestrian, with the siting of caravans for intermittent residential use to a mix of Agricultural, Equestrian and Gypsy and Traveller residential use (part retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 May 2024
✓
Validated
31 May 2024
✓
Consultation
3 Jul 2025
✓
Committee
18 Feb 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 17 Jul 2025; it is now day 880.

The consultation period closed on 17 Jul 2025.

Planning committee

Decided by South Norfolk Broadland South Norfolk Development Management (Planning) Committee on 18 Feb 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised approval because the revised scheme could provide acceptable access, landscaping, noise mitigation and two pitches addressing a supply shortage.
  • Supporters and objectors commented, with objections covering traffic, noise, wildlife, odour, road conditions, need and the site’s location.
  • Members voted 5–0, with one abstention, to approve the application subject to conditions.
Read how the committee decided The proposal, site context, officers’ assessment, consultation responses, objections, recommendation, vote and conditions.

Source: Plota analysis of South Norfolk Broadland's committee minutes of 18 Feb 2026.

Documents 41

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 380 m away: Hornsea Project Three Offshore Wind Farm
The site is 380 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: A47 - A11 Thickthorn Junction (decided, 1145 m); Norwich to Tilbury (examination closed, recommendation due, 1668 m); Sheringham and Dudgeon Extension Projects (decided, 1674 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £42,000 in July 2018. Other property, freehold.

11 July 2018£42,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR4 6TL
Received
10 May 2024
Validated
31 May 2024
Ward
Cringleford
Parish
Keswick And Intwood
Case officer
Show
Target decision
30 Jul 2025
Applicant
Show
Agent
MH Planning

Decision outlook

Day 880, past the statutory target. 49% of full applications in South Norfolk Broadland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 880824 days past the 56-day target
24%decided within 8 weeks
86%approved
11%go to committee

Plota live figures for full applications decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

10comments received
7 objecting3 supporting

70% object · below the UK average of 74%

11 neighbours consulted · Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-12967850
Planning Portal ref
PP-12967850
Neighbours
3 Jul 2025
Consultation
3 Jul 2025
Comments by
17 Jul 2025
Site or press notice
19 Jun 2024
Committee
18 Feb 2026
Statutory expiry
26 Jul 2024
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Change of use

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026