3 Green Lane Aston 0003 Data via plota.co.uk

RB2025/1621 Approved

Proposal

Erection of detached garage/store Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Dec 2025
✓
Validated
12 Dec 2025
✓
Approved
2 Feb 2026

Approved on 2 Feb 2026 · Delegated (Part 2A) · Last checked 14 Oct 2026

Site constraints 8

Bat Zone | Residential Area
Aston conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 919 m away: Whitestone Solar Farm
The site is about 919 m from the project boundary. Generating station, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Bat Zone | Residential AreaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Coalfield, development low risk area; Inside the Swallownest and Aston built-up area; Green belt about 35 m away: South and West Yorkshire; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
9 Dec 2025
Validated
12 Dec 2025
Ward
Aston & Todwick Ward
Parish
Aston Cum Aughton
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
2 Feb 2026
Decision level
Delegated (Part 2A)
Applicant
Show

How this decision compares

Decided in 52 days from validation, 49 days faster than Rotherham's median of 101 for full applications. Approved, as 100% of full applications here are.

24%decided within 8 weeks
100%approved
21decided in the last year

Plota live figures for full applications decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Consultation
12 Dec 2025
Comments by
14 Jan 2026
Site or press notice
24 Dec 2025
Statutory expiry
6 Feb 2026
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 councils
Relevant to this application:
Householder decisions

Rotherham ranks #107 out of 296 councils for householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026