69 Coleraine Road, Blackheath, London, SE3 7PF Data via plota.co.uk

26/1404/HD - Householders Approved

Proposal

Installation of a new roof and rooflights to the dwellinghouse including zinc cladding and an additional window to the existing dormer. Demolition and construction of a single-storey side extension incorporating a side access gate and extension of the rear patio. Replacement and installation of windows and doors; installation of a fence, gate and metal railings to the front. Soft landscaping, permeable drive and non-permeable path with associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2026
✓
Validated
31 Jul 2026
✓
Consultation
4 Aug 2026
✓
Approved
21 Oct 2026

Approved on 21 Oct 2026 · Delegation · Last checked 22 Oct 2026

Documents 28

All documents on the council site ↗

Site constraints 6

Heritage at risk: Westcombe Park, Greenwich
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 486 m away: Thames Tideway Tunnel
The site is 486 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1332 m); London Strategic Heat Main Project (at pre-application, 455 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Greenwich built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area206 m² (2,217 sq ft)
Energy ratingD (55 out of 100), could reach C
PropertySemi-detached house, 9 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Householders
Postcode
SE3 7PF
Received
8 May 2026
Validated
31 Jul 2026
Ward
BLACKHEATH WESTCOMBE
Parish
Greenwich
Case officer
Show
Target decision
21 Oct 2026
Decision
Approve
Decision date
21 Oct 2026
Decision level
Delegation
Applicant
Show
Agent
BLUELINE ARCHITECTURAL CONSULTANTS LTD

How this decision compares

Decided in 82 days from validation, 26 days slower than Greenwich's median of 56 for extensions. Approved, as 77% of extensions here are.

82%decided within 8 weeks
77%approved
835decided in the last year

Plota live figures for extensions decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

1comment received
1 neutral

18 neighbours consulted · Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14872794
Planning Portal ref
PP-14872794
Consultation
4 Aug 2026
Comments by
2 Sept 2026
Statutory expiry
25 Sept 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Householder decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.