WL/2026/00721 - Condition Discharge Approved

Proposal

Request for confirmation of compliance with conditions 7 and 8(noise) of planning permission granted 15th September 2021. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
11 Aug 2026
✓
Approved
29 Sept 2026

Approved on 29 Sept 2026 · Delegated · Last checked 30 Sept 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions details submitted for 7, 8

    • ConditionsRequest for confirmation of compliance with conditions 7 and 8(noise) of planning permission…This applicationWL/2026/00721

Site constraints 6

Grade II listed: 3 and 4, Market Place
List entry 1359831 · 1 m away · 42 more listed buildings within 150 m (42 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 42 with distances
Historic England ↗
Caistor conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 39 m away: Caistor Roman town
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Caistor built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Condition Discharge
Postcode
LN7 6TJ
Received
6 Aug 2026
Validated
11 Aug 2026
Ward
CAISTOR AND YARBOROUGH
Parish
Caistor CP
Case officer
Show
Target decision
6 Oct 2026
Decision
Condition discharged
Decision date
29 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
Anotherkind Architects

Consultation & key dates

Alt. reference
EC/2026/00762
Comments by
1 Sept 2026
Committee
11 Aug 2026
Statutory expiry
6 Oct 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Householder decisions

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026