Harecastle Farm Newcastle Road Talke Stoke-On-Trent Staffordshire ST7 1UR Data via plota.co.uk

26/00545/LBC - Listed Building Consent Pending Consideration

Proposal

Fibre telecoms cable to be span onto the building and attached at top of building underneath eaves. Then 80m cable on wall to be run down the eaves and across building following existing cable between ground floor and first floor windows. Cable will go along edges so as to not stand out. Cable will go round to extension building and go into it via a new drilled hole next to the internal comms cabinet. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
11 Aug 2026
Consultation
24 Aug 2026
Decision
Expected by 6 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 6 Oct 2026, from recent listed building consent across the UK. Comments are open until 25 Sept 2026.

Comment on this application ↗

Site constraints 6

Grade II listed: Harecastle Farmhouse
List entry 1374407 · 19 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Green belt: Stoke-on-Trent
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Local nature reserve 140 m away: Bathpool Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Talke and Talke Pits built-up area; the 1970s provisional farmland map had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle under Lyme - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
ST7 1UR
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
Talke & Butt Lane
Parish
Kidsgrove
Case officer
Show
Decision level
Delegated Decision
Applicant
Show
Agent
Openreach

Decision outlook

Day 33 of the 56-day target. Councils usually decide listed building consent by day 56.

Day 3323 days to the 56-day target
58%decided within 8 weeks
93%approved
10,378decided in the last year

Plota live figures for listed building consent decided across the UK in the last twelve months, from validation; too few recent listed building consent in Newcastle under Lyme to go on. Newcastle under Lyme decision record →

Public comments

No public comments yet.

Last counted 9 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15116746
Consultation
24 Aug 2026
Comments by
25 Sept 2026
Site or press notice
28 Aug 2026
Env. assessment
No
Newcastle under Lyme
Planning Authority Score
6.5/10
Good
#78 of 296 councils
Relevant to this application:
Other decisions

Newcastle under Lyme ranks #133 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle under Lyme decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #61 of 296
98%
Householder approved
Above avg (90%) #19 of 296
68%
Decided in 8 weeks
Above avg (63%) #133 of 296
41%
Extended time limit
Below avg (41%) #159 of 296
80%
Minor dwellings approved
109 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
97%
Change of use approved
30 decided
485
Total decisions
34 refused in the year to March 2026