49 Martingale Way Portishead Data via plota.co.uk

26/P/1834/S73 - Section 73 - vary/remove conditions Awaiting decision

Proposal

Section 73 application to vary condition 12 (Operating Hours) attached to planning permission (Change of use from Assisted Living Development comprising 126 apartments and integrated care, support and well-being facilities for the over 60's age group (Use Class C2) to 127 non-age restricted apartments (Use Class C3) with associated changes to soft landscaping and car parking, together with 500sqm of commercial/community space under Classes E (Commercial, Business and Service) and/or F (Local Community and Learning); and 350sqm for health/beauty spa (Sui Generis) or medical/health services (Class E (e)) to amend the condition from 'The ground floor commercial units hereby approved, shall not be open before 07:00 hours nor after 23:00 on Mondays to Saturdays or before 08:00 hours nor after 13:00 on Sundays or Bank Holidays.' To 'The ground floor commercial units hereby approved, shall not be open before 07:00 hours nor after 23:00 on Mondays to Saturdays or before 08:00 hours nor after 22:00 on Sundays or Bank Holidays'. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
Decision
Expected by 8 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 8 Dec 2026.

Comments are open until 15 Oct 2026

Comment on this application ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 150 m away: Portishead Branch Line - MetroWest Phase 1
The site is 150 m from the project boundary. Railway, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection (decided, 1037 m); Hinkley Point C Connection Project Material Change (at pre-application, 1061 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the Portishead built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Somerset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Section 73 - vary/remove conditions
Received
8 Sept 2026
Validated
8 Sept 2026
Ward
Portishead East
Parish
Portishead
Case officer
Show
Target decision
8 Dec 2026
Applicant
Show
Agent
Stokes Morgan Planning Ltd

Public comments

1comment received
1 supporting

159 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
15 Oct 2026
Statutory expiry
8 Dec 2026
Env. assessment
No
North Somerset
Planning Authority Score
6.4/10
Average
#83 of 296 councils
Relevant to this application:
Change of use

North Somerset is faster than most councils at deciding householder applications, ranking #96 out of 296. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
North Somerset decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #137 of 296
93%
Householder approved
Above avg (90%) #134 of 296
73%
Decided in 8 weeks
Above avg (63%) #96 of 296
34%
Extended time limit
Below avg (41%) #88 of 296
74%
Minor dwellings approved
135 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
85%
Change of use approved
52 decided
1,139
Total decisions
128 refused in the year to March 2026