Morrisons, Broadway, Bridgwater, Somerset, TA6 3LN Data via plota.co.uk

08/26/00086 - Full Planning Permission Pending

Proposal

Creation of electric vehicle (EV) charging zone, including erection of EV charging points, canopy, sub-station enclosure, low voltage (LV) panel, meter cabinet, plant room and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 20 Nov 2026 and 29 Nov 2026, from Sedgemoor's recent utility and infrastructure works.

Comments are open until 7 Nov 2026

Comment on this application ↗

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Bridgwater built-up area; Priority habitat about 31 m away: No main habitat but additional habitats present.
Not affected
Not green belt · No scheduled monument at the site

Checked on 10 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Full Planning Permission
Postcode
TA6 3LN
Received
5 Oct 2026
Validated
5 Oct 2026
Parish
Bridgwater
Case officer
Show
Applicant
Show
Agent
Carney Sweeney, Brunel House

Decision outlook

Day 23 of the 56-day target. Sedgemoor usually decides utility and infrastructure works by day 48.

Day 2333 days to the 56-day target
66%decided within 8 weeks
94%approved
38decided in the last year

Plota live figures for utility and infrastructure works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
9 Oct 2026
Comments by
7 Nov 2026